Now The Details - (last page was a brief overview).

South End View on May 12th.

The city required we put in sewage lines along some of 'Old Victoria Road'. So early on in May and this date on the 13th, part of the road had to be dug up from the north end (where the Kingdom Hall will be build) down to this photo in the south end. This was single lane traffic until sewage lines were put in. This required qualified TCP in which many volunteered to become qualified. All these qualified volunteer Brothers and Sisters above and below ground level worked to put in the pipe line. Everybody working as a team from the sweepers to the excavator operator. -- The next two pictures below (May 12th, 10am) is a close-up of the above picture.

Single Lane Traffic -- Bro. Glover (TCP) keeping watch so all goes smoothly.

North End View on May 13th.

While road work and sewage lines were being put in at the south end, a lot of ground work had to be done at the spot of where the hall and parking lot was going to be put.


If you look closely in the above picture on the right, a temporary road is being constructed so that both lanes of 'Old Victoria Road' could be dug up on June 11th. This allowed the electrical wiring from the right side of the street be put across under the road to the left side so that a street light could be put in. On the left side is Melideo Road. Not much to see, just a small gravel road.

The landscape is starting to change. The trees are gone by the road and a few more will be cut down later. This view is from the north end while work is happening in the south end. Below is a close-up of the above picture.