Being prepared on the right hand side (above picture), is the footings for the back cement wall and on top of that the wooden fence. The work putting in the pipe line has been finished on this south end (above picture) while the north end of the road (bottom picture) is just about finished with the underground pipe line.
Below is a close-up of the above picture. Notice the homes in the background and some are blue? They will be completly hidden from view with the back wall and a brown fence on top of that (from the same point of view).
Now to the left of the above picture (same moment) they are finishing the pipe line infront of Melideo Road (below).
Just left of Melideo Road, the pipe line is being buried (May 19th).
Melideo Road is getting ready and it's single lane traffic on Old Victoria Road (May 21).
That shed in the background is about to be moved.